Heavy Duty Electric Powered Delivery Trolley – Case Study
A manufacturing client operating within a busy facility required a safe and efficient solution for transporting sub-assembly parts weighing up to 3.5 tonnes with a span of 5 metres. The client sought a solution that would eliminate the need for additional equipment while maintaining a high standard of safety and ease of use.
View Project3D Prototype Fire Escape Staircase – Case Study
Our client required a new fire escape to ensure health and safety regulations. EDS produced a 3D prototype of the fire escape which would demonstrate the suitability. Followed by our experienced design team providing the client’s third-party manufacturer with a complete drawing pack which allowed the fire escape to be fabricated to the required standards.
View ProjectVacuum Lifting Bar
Required to lift a painted sheet steel fabrication which exceeded the specified manual handling limit. The component needed to be lifted horizontally from a delivery stillage to the production line using an overhead crane.
View ProjectAuto Engaging Container Lifting Beam
Used to help unload unevenly loaded containers from the back of a lorry using an existing crane system. The beam needed to lock into position on the container without the need for an operator to climb up a ladder or on top of the container to attach or rotate a lift lug.
View ProjectHeavy Duty Turnover Frame
This needed to be able to pick up a set of components weighing up to five tonnes with only a forklift available. Once the components had been lifted they needed to rotated by 180° to allow for maintenance staff to work on both sides.
View Project